Project Overview

Domo Resort is a boutique eco-resort planned on the cliffs of Nusa Penida, the island east of Bali. The programme, confirmed by the owner, has 16 keys: 8 Ocean View Master Villas of about 50 m², 6 Standard Rooms of about 40 m² and 2 Penthouses of about 128 m², one of them with a private infinity pool. A reception and lounge, a bar and restaurant, a spa with sauna and a public pool complete the resort, for a gross floor area of about 3,636 m².

The architecture follows a curvilinear, contemporary tropical language with natural materials, a strong indoor–outdoor connection and low-impact construction. Site area, land title, sea access and permits are still being verified and are listed as open points on this page.

Executive Summary

A 16-key boutique eco-resort on the cliffs of Nusa Penida: 8 Ocean View Master Villas, 6 Standard Rooms and 2 Penthouses, with restaurant, spa and infinity pool. Returns are shown in three scenarios from one financial model with explicit, sourced assumptions.

Target Investment

€3,475k

Min Entry

€50k

Target IRR (base case)

22.0%

Land title

Under legal verification

Resort Configuration & Operations

Room Inventory & ADR Breakdown

16 keys: 8 Ocean View Master Villas, 6 Standard Rooms and 2 Penthouses (one with a private pool). Published rates are peak-season rack rates; the model uses a lower realised rate.

Ocean View Master Villa
8 Units

Ocean View Master Villa

Size 50 mq
Rack rate €450 Realised ADR (model): €274
Peak / low season: €350 / €175
Standard Room
6 Units

Standard Room

Size 40 mq
Rack rate €180 Realised ADR (model): €109
Peak / low season: €140 / €70
Penthouse
1 Unit

Penthouse

Size 128 mq
Rack rate €700 Realised ADR (model): €426
Peak / low season: €545 / €272
Penthouse with Private Pool
1 Unit

Penthouse with Private Pool

Size 128 mq
Rack rate €1,200 Realised ADR (model): €729
Peak / low season: €934 / €467

Resort Revenue Engine Explained

From rack rates to the revenue model
Weighted rack rate€411
Realised blended ADR used in the model€250
Realisation factor61%

The typology rates above are peak-season list prices. Revenue is calculated on a realised blended ADR of €250 (year 1, 2029 prices), i.e. 61% of the weighted rack rate, to reflect low-season pricing (5 months at 64% of the realised rate), packages and complimentary nights. Each typology's realised rate is derived from its rack rate in the same proportion. The realisation factor is an assumption to be validated with a revenue-management study.

ADR figures are net of the 10% regional hotel tax (PB1) and of the service charge. OTA commissions and payment fees are treated as distribution costs in OPEX, not deducted from ADR.

Room revenue = keys × 365 × occupancy × realised ADR
Ancillary revenue (F&B, spa, activities)

Ancillary revenue is built from operating drivers, not as a flat share of room revenue. Base case, year 3 (72% occupancy, 4.205 room nights, 7.569 guest nights):

StreamVolumeAvg. priceRevenueCost of salesMargin
Restaurant & bar4.541 covers€27€145.93935%€94.860
Spa & wellness2.649 treatments€21€56.75425%€42.566
Activities & transfers4.205 room nights€11€45.04340%€27.026
Events12 events€1,607€19.28240%€11.569
Total ancillary€267.01823.7% of room revenue

F&B: 60% of guest nights at €25 per cover, plus 20% external guests. Spa: 35% capture at €20. Activities: €10 per room night (transfer, tour and rental commissions). Events: 1 per month at €1,500. Conservative and upside scenarios use lower and higher capture and spend.

AI Location Intelligence

Why Nusa Penida, Bali?

Nusa Penida attracts diving, nature and photography travellers and receives spillover demand from Bali. The island is a niche premium destination rather than a mass market: the opportunity lies in a small, design-led property with a realised rate above the island's short-stay average.

Tourism Flux Trend (Annual Visitors)

Development Roadmap

Development years 2026 – 2029
Opening Apr 2029
Operating year 1 Apr 2029 – Mar 2030
Exit (end of operating year 5) Mar 2034

Schedule anchored on the funding deadline (Feb 2027): design from Oct 2026, construction 18 months from Aug 2027, opening Apr 2029. Any change to the opening date moves the pre-opening programme with it.

DESIGN & DEVELOPMENT
Oct 2026 – Jan 2027
PERMITS & LEGAL
Feb 2027 – Jul 2027
CONSTRUCTION
Aug 2027 – Jan 2029
PRE-OPENING & LAUNCH
Feb 2029 – Mar 2029
PRE-OPENING SALES & MARKETING
Oct 2028 – Mar 2029
Commercial plan

Pre-opening demand strategy

Achieving the targeted 65% occupancy in operating year 2 depends on a structured pre-opening sales and marketing programme beginning at least six months before the resort welcomes its first guests. This programme will build awareness, qualified demand, distribution partnerships and advance bookings. The occupancy figure is a planning target, not a guaranteed result, and will be reviewed against measurable booking and conversion milestones.

With the opening planned for Apr 2029, the programme starts no later than Oct 2028 (brand foundations from Apr 2028). If the opening date changes, this milestone moves with it.

Programme · Proposed budget
Brand identity, website and booking engine€15.000
Content: renders, photography, video, storytelling€15.000
PR, travel trade and concierge partnerships, familiarisation trips€12.000
Measurable campaigns (search, social, email) and advance-booking offers€20.000
CRM, guest database with consent, analytics€5.000
Sales & marketing lead (part-time, 6 months)€8.000
Proposed budget€75.000

Proposed pre-opening budget of €75.000, included in CAPEX as a separate line and pending approval. Recurring marketing (3% of revenue) and OTA commissions are in OPEX.

Monthly indicators
  • Qualified contacts in the database
  • Advance bookings on the books, by future month
  • Cost of acquisition per booking
  • Direct vs OTA share of bookings
  • Realised ADR vs the €250 model assumption
  • Forward occupancy for each month of operating year 1
Responsibilities

Sponsor / GP: brand, budget, approvals and partnerships. Sales & marketing lead: execution, distribution set-up and reporting. Revenue manager (or operator): pricing, channel mix and OTA connectivity. Studio: architectural content and visuals. External PR agency: media and trade relations.

Optional initiative

Unreal Engine 5 experience

An optional Unreal Engine 5 experience could bring the resort to life before opening. Guests and future visitors would be able to explore a high-quality interactive version of the property, discover its architecture and take part in shareable experiences. This offers a way to build an engaged community beyond conventional photography and video. Development would proceed in stages, subject to a separate budget and measurable marketing goals; no revenue from this initiative is included in the base financial forecast.

Why it complements renders, photos and video

Renders and film show the resort; an interactive scene lets people walk the cliff path at sunset, open a villa, compare the two penthouses and share a moment with friends. It gives future guests a reason to return while the site is still under construction, and it turns interest into contacts that the pre-opening programme can follow up.

Phase 1 – Explorable prototype

Terrain, landscape and the resort massing from the architectural model; one villa and the penthouse interiors; a guided walk. Goal: validate quality, performance and interest with a small test group.

Phase 2 – Social features and consented contacts

Small shareable challenges (sunset photo spots, cliff-path trails, discover-the-villas), a visitor profile and an opt-in to receive opening offers. Goal: measured usage, share rate and qualified contacts feeding the pre-opening database.

Phase 3 – Expansion, only if the numbers justify it

Seasonal events, more of the island, multiplayer moments. Decided after phase 2 on measured usage, conversion to bookings and cost per contact.

Distribution

A downloadable PC/Mac build, interactive pixel streaming from the cloud and browser access have different costs, quality and reach. Unreal Engine 5 has no native browser export, so browser access means streaming (per-session cost) or a reduced web version. The platform is chosen after the phase-1 prototype, not promised beforehand.

Privacy & consent

Community data is collected with explicit consent, a clear purpose (opening offers and updates), an easy opt-out and compliance with Indonesian personal-data law (UU PDP) and the GDPR for European guests.

Budget & scope

A complete experience needs its own design, development, distribution platform, maintenance and budget. Costs, player numbers and any economic return are not estimated here and are not included in CAPEX, revenue or IRR until an approved quotation and measurable objectives exist.

Market insights

Market Analysis Explorer

Market insights

Market Analysis Explorer

Market insights

Market Analysis Explorer

🔹 Market Demand
not documented – official BPS/Klungkung data pending
Europe, Australia, remote workers
Diving, nature, photography, eco-tourism
🔹 Pricing Dynamics
June–August and December (project brochure)
≈ USD 138 (short-stay listings, brochure survey)
around 60% in 2025 (brochure, BPS)
🔹 Competitive Edge
Boutique villas in Uluwatu and on Nusa Penida (study pending)
Cliffside ocean views, design-led architecture
Marked (7 peak / 5 low months)
🔹 Industry Trends
Eco-luxury boutique
High
Extended stays, remote work
🔹 Strategy & Exit
Sale to an operator or private buyer, year 5
Access and ferry reliability, permits, cost inflation

Area data (island listings, Bali hotel occupancy) describe the market; the resort's own rate and occupancy are planning targets for a new, design-led property and are not derived from a documented comparable set. A comparable study is pending.

Projected ROI Breakdown

Metric Value
Land Acquisition €350.000
Construction €1.500.000
Furniture & Interiors €650.000
Other €315.000
Design & Architecture €250.000
Project Management €70.000
Permits & Legal €75.000
Pre-opening €75.000
Working capital €190.000
Total Investment €3.475.000
Exit value (gross, year 5) €8.315.658
Net exit proceeds after 3.0% selling costs and 2.5% transfer tax €7.858.297
Base-case IRR 22.0%
Equity multiple 3.00x
Timeline 30 Months

Investment Rationale

The investment case rests on three elements: a low-density property that is easy to fill (16 keys), a rate positioned above the island average thanks to design and location, and a cost base sized for a small team. Every figure is derived from the model shown on this page and can be reviewed line by line.

Sponsor analysis

Strategic Investor Analysis

1. Positioning

Domo Resort is a 16-key boutique property on a cliffside site of Nusa Penida with ocean views. The architecture and the size of the inventory are the basis for a realised rate above the island's short-stay average; the target rate and occupancy are planning assumptions and are tested in three scenarios.

2. Operating model

The resort is sized for a team of 26 with lean overheads. Operating costs are built line by line (payroll with on-costs, cost of sales, distribution, marketing, utilities, maintenance and FF&E reserve, insurance, administration and a management fee) so that the EBITDA margin follows from the cost structure rather than from a target.

3. Market context

Nusa Penida has grown from a day-trip destination into a multi-day one, with demand driven by diving, nature and photography and by spillover from Bali. Official visitor statistics, a comparable-rate study and the permitting framework are still to be documented; the model does not rely on visitor-growth assumptions and treats regulatory risk (development moratoria, tourist levies) as a timeline risk.

Elite Data Engine

Investment Snapshot

Simulate your returns by adjusting the investment amount below.

💼 My Investment (Simulator)
€
Insert a value to simulate
Target IRR

22.0%

Stabilised revenue (year 5)

€1.6M

EBITDA Margin

48.2%

Horizon

5 Years

Capital recovery

Year 5 (with exit)

Total Investment

€3.5M

📈 Indicative year-3 distribution for €100.000

€15.724

Pro-rata share of base-case free cash flow, before any sponsor promote or platform fee. IRR (22.0%) is a rate of return over the whole holding period including the exit; it is not an annual income.
Interactive Simulator

Calculate Your Return

Your Equity Share

0%

Ownership Stake
Avg. annual distribution

€0

years 1–5, pro-rata
Total proceeds (5 years)

€0

Distributions + net exit
Equity multiple

0.0x

Proceeds ÷ investment

Figures are pro-rata shares of the base-case model, before any promote or fee. Actual performance may vary. The three scenarios run through the same model with different occupancy, ADR, ancillary, cost, capital-cost and timing assumptions. The conservative case is a downside stress: lower rates and occupancy, a third-party operator fee, a 10% construction overrun and a six-month opening delay together.

Scenario Logic

Scenario IRR

CONSERVATIVE2.9%
BASE CASE22.0%
UPSIDE30.8%
Strategic Analysis

Financial Performance

The resort is planned as a low-density boutique property: 16 keys across three typologies, a restaurant and bar, a spa and a public infinity pool. Revenue comes from a realised rate positioned above the island's short-stay average and from ancillary services sized on guest nights.

Operating costs are built line by line: payroll for 26 staff with on-costs, cost of sales, distribution and marketing, utilities, maintenance and an FF&E reserve, insurance, administration and a management fee. All ratios are listed in the assumptions table below.

>
Anchor Market Data

Market Positioning

Nusa Penida is one of Bali’s fastest-growing destinations, with increasing demand for high-end, design-driven accommodations.

Market reference (to be re-verified)
€125 Avg. ADR
Nusa Penida short-stay listings, 2025 survey quoted in the project brochure (≈ USD 138)
Domo Resort target realised ADR
€250 Target ADR

Area data (island listings, Bali hotel occupancy) describe the market; the resort's own rate and occupancy are planning targets for a new, design-led property and are not derived from a documented comparable set. A comparable study is pending.

Capital Appreciation

Returns & Exit Strategy

The base case targets an EBITDA margin of 48% at stabilisation (year 5). Cash available for distribution is EBITDA after corporate income tax; the model assumes 100% equity funding and no debt.

  • Distributions from operating year 1, subject to actual cash flow
  • Value creation through stabilised operating income, not through assumed price growth
  • Holding structure (PT PMA) and investor terms to be defined with local counsel
Primary Exit Approach Exit modelled at the end of operating year 5: year-5 EBITDA of €748.409 capitalised at 9.0%, less 3.0% selling costs and 2.5% transfer tax, giving net proceeds of €7.858.297. A sale to a hospitality operator or a private buyer is the assumed route; no buyer is identified.
Risk Management

Risk & Mitigation

Returns are presented in three scenarios with the same formulas; the sensitivity table and the delay/overrun variants show how much the outcome depends on rate, occupancy, timing and construction cost.

Low Density

Reducing operational complexity and staff overhead.

Strong Brand

Architectural identity supporting premium ADR.

Diversified Rev

Accommodation, F&B, and Wellness revenue streams.

Active GP

Direct sponsor involvement in development & control.

Disclaimer: This material is for informational purposes only and does not constitute an offer or solicitation to invest. Details are provided upon request for qualified partners.

Capital Allocation (CAPEX)

Detailed budget breakdown by category

This chart shows how the €3.475.000 total capital requirement is allocated: the admin budget of €3.210.000, the proposed pre-opening programme and a working-capital reserve equal to 3 months of operating costs.

Detailed Budget

Category Investment Item Status Amount
Land Acquisition Land acquisition Title pending €350.000
Construction Main Structure & Roof Budget line €1.500.000
Furniture & Interiors Elite FF&E Package Budget line €450.000
Other Safety Reserve Contingency €290.000
Design & Architecture Architectural & Technical Design Budget line €200.000
Furniture & Interiors Lighting & decoration Budget line €80.000
Furniture & Interiors Equipment (AC, system) Budget line €120.000
Project Management Project management Budget line €70.000
Design & Architecture Engineering consultant Budget line €50.000
Permits & Legal Building permits & licenses Budget line €60.000
Permits & Legal Legal & company setup Budget line €15.000
Other Staff training & hiring Budget line €25.000
Pre-opening Pre-opening sales & marketing programme Proposed €75.000
Working capital Working capital & opening cash reserve Formula €190.000
Total capital requirement €3.475.000
Items awaiting a quotation
  • Site preparation and earthworks
  • External infrastructure: access road, water supply, power connection, wastewater
  • Swimming pools (public infinity pool, penthouse pool)
  • MEP systems beyond air-conditioning (plumbing, electrical, fire safety, ICT)
  • Landscaping

These items are not itemised in the current budget. Either they are included in the 'Main Structure & Roof' lump sum, which must be confirmed with the contractor, or they will add to the total. The total above is therefore a floor, not a ceiling.

Operational Cost Structure (OPEX)

Operating cost build-up (base case, year 3) · Revenue €1.393.090

Cost lineBasisAmount% of revenue
Payroll26 staff, €158.880 base payroll + 30% on-costs (BPJS, THR, meals, uniforms, training)€217.00015.6%
Cost of salesF&B 35%, spa 25%, activities and events 40% of the respective revenue€90.9976.5%
Distribution (OTA & payments)50% of room nights via OTA at 15% commission + 1.5% payment fees€101.3467.3%
Sales & marketing (recurring)3% of total revenue€41.7933.0%
Utilities (power, generator, water)€24.000 fixed + 2% of revenue€53.0773.8%
Repairs & maintenance€2.800 per key€47.0683.4%
FF&E reserve3% of total revenue€41.7933.0%
Insurance€8.000€8.4050.6%
Administration, licences, technologyaccounting & licences €10.000, admin & logistics €15.000, PMS/booking systems €9.000€35.7212.6%
Housekeeping consumables & laundry€8 per room night€35.3412.5%
Management fee5% of total revenue€69.6545.0%
Total operating costsof which fixed €333.410€742.19653.3%
EBITDA€650.89346.7%

The staff table and cost items entered in the admin are the documented cost base (€325.880 per year: €158.880 payroll and €167.000 other items). The build-up above adds on-costs and the variable costs that scale with revenue, which is why total operating costs are higher than the admin list.

Same formulas, different assumptions

Scenario comparison

ConservativeBaseUpside
Occupancy ramp (Y1 → stabilised)45% → 55% → 62% → 65%55% → 65% → 72% → 75%60% → 72% → 78% → 80%
Realised ADR (year 1)€225€250€280
Ancillary (% of rooms)18.4%23.6%30.9%
Management fee (% of revenue)12%5%5%
Construction overrun10%0%0%
Opening delay6 months (Oct 2029)0 months (Apr 2029)0 months (Apr 2029)
Exit cap rate10.0%9.0%8.5%
Total capital€3.740.000€3.475.000€3.501.000
Year-5 revenue€1.160.184€1.553.631€1.964.819
Year-5 EBITDA€345.781 (30%)€748.409 (48%)€1.049.047 (53%)
Gross exit value€3.457.812€8.315.658€12.341.725
Net exit proceeds€3.267.633€7.858.297€11.662.930
Project IRR2.9%22.0%30.8%
Equity multiple1.18x3.00x4.37x
Payback from operations> 10 years6.4 Years4.8 Years
Avg. cash yield on capital6.2%14.8%20.7%
Effect of delays and overruns on the base case
VariantTotal capitalOpeningIRRChange vs base
Base€3.475.000Apr 202922.0%—
Base + 6-month delay€3.523.000Oct 202920.8%-1.2 pt
Base + 12-month delay€3.571.000Apr 203019.6%-2.4 pt
Base + 10% construction overrun€3.690.000Apr 202920.7%-1.3 pt
Base + 20% construction overrun€3.905.000Apr 202919.5%-2.5 pt
Base + 6-month delay + 10% overrun€3.738.000Oct 202919.5%-2.5 pt

A delay adds holding costs (€8.000 per month) and postpones every operating cash flow; an overrun is applied to the construction and fit-out lines.

Revenue by typology and season (base case, year 3)
TypologyUnitsPeak ADRLow ADRRoom nightsRoom revenue
Ocean View Master Villa8€375€1882.103€616.126
Standard Room6€150€751.577€184.831
Penthouse1€583€292263€119.800
Penthouse with Private Pool1€1,000€500263€205.371
Total16Peak season €829.942 / Low season €296.1304.205€1.126.072

7 peak months at 128% and 5 low months at 64% of the realised rate; occupancy applied uniformly. Split shown for planning; the annual total equals keys × occupancy × realised ADR × 365.

OPEX ratio (year 3)53%
Management Fee5%
Maintenance per key€2.800

Operating assumptions of the base case; the scenario buttons switch every figure on this page.

Financial analysis

10-Year Financial Forecast

Estimated exit value (gross, base case, year 5)

€8.315.658

net €7.858.297 after selling costs and transfer tax
Cumulative Cash Flow i
Annual EBITDA i
Target Revenue i
My Estimated Payout i
PROJECTED IRR
--
Forecast Internal Return
EQUITY MULTIPLE
--
Projected Capital Growth
PAYBACK PERIOD
--
Target Capital Recovery
STABILIZED EBITDA
--
Est. Year 5 Net Profit
Note: Estimated values based on projected financial scenario.
Cumulative Revenue

Total gross income generated over the project lifecycle.

Σ (ADR × Occ × Units × 365)
Cumulative Cash Flow

Net capital remaining after all costs and investment recovery.

Σ(Rev - Opex - Tax) - Inv
Annual EBITDA

Performance operative excluding non-cash items and taxes.

Revenue - OPEX
Investor Return

Net profit share attributable to your specific investment.

(Cash Flow × My Investment) / Total
Capital recovery in year 6.4 from operating cash flow; year 5 including the exit proceeds.

Cumulative free cash flow from the first capital call, with the net exit proceeds in the exit year. This is a projection, not a guarantee.

10-Year EBITDA & Revenue Projection

Values in Euro (€)

Cash Flow Analysis

Target Yield 14.80%
Equity Multiple 3.00

Annual Net Cash Flow Table

Year Estimated Occupancy Gross Revenue Operational Profit (EBITDA) Corporate tax Free cash flow
Year 1 55% €997.660 €386.064 €46.214 €339.850
Year 2 65% €1.216.932 €533.830 €78.723 €455.108
Year 3 72% €1.393.090 €650.893 €104.477 €546.417
Year 4 75% €1.501.093 €719.434 €119.556 €599.879
Year 5 75% €1.553.631 €748.409 €125.930 €622.479
Year 6 75% €1.608.008 €778.493 €132.549 €645.945
Year 7 75% €1.664.289 €809.727 €139.420 €670.307
Year 8 75% €1.722.539 €842.154 €146.554 €695.600
Year 9 75% €1.782.828 €875.819 €171.835 €703.983
Year 10 75% €1.845.227 €910.766 €179.523 €731.242

Annual figures for operating years 1–10 (base case). Year 1 starts at the opening (Apr 2029). Free cash flow = EBITDA − corporate income tax; the FF&E reserve is already inside operating costs.

ADR Growth

+3.50% Annual

Cost growth

+2.50% Annual

Break-even Occupancy

23.9% operating costs only

44.5% incl. 8% preferred return

Occupancy at which year-3 revenue covers all operating costs (first figure), or operating costs plus an 8% annual return on the total capital (second figure). Neither covers capital repayment or debt, which the model does not assume.

Risk Sensitivity Analysis

Sensitivity Matrix (IRR Analysis)

Base Case: €250 @ 75%
ADR \ OCC 60% 65% 70% 75% 80%
€200 7.8% 10.7% 13.2% 15.5% 17.7%
€225 11.5% 14.3% 16.7% 19.0% 21.1%
€250 14.7% 17.4% 19.8% 22.0% 24.1%
€275 17.6% 20.2% 22.6% 24.8% 26.8%
€300 20.2% 22.8% 25.1% 27.3% 29.3%

Project IRR from the first capital call, including the year-5 exit at the scenario cap rate. Occupancy columns are the stabilised level; the ramp-up is scaled proportionally.

Legal Disclaimer: This sensitivity analysis is based on historical market performance and projected operational standards in Nusa Penida. Actual results may vary depending on global tourism trends, local regulations, and macroeconomic factors. This is not a guarantee of future returns.

Explicit assumptions

Assumptions and sources

AssumptionValueSource
Inventory16 keys (8 + 6 + 2)Owner-confirmed unit programme; project brochure p. 2
Rack rates by typologyOcean View Master Villa €450, Standard Room €180, Penthouse €700, Penthouse with Private Pool €1,200Admin unit table (owner input)
Realised blended ADR used in the model€250 (61%)Owner input (admin ADR base); consistent with the €320 peak / €160 low seasonal split entered by the owner. Realisation vs rack rate to be validated.
ADR growth+3.5% / YearOwner input (admin)
Occupancy ramp55% → 65% → 72% → 75%Planning target; Bali star-hotel occupancy around 60% (brochure p. 3). Requires the pre-opening programme.
Ancillary drivers23.6% of room revenueOwner's service configuration (restaurant, spa, events); activities commission is a model assumption
Staffing26 staff, €158.880 per yearAdmin staff table (owner input); on-costs 30% are a model assumption
Variable cost ratiosOTA 50% × 15%, Sales & marketing (recurring) 3%, FF&E 3%, Management fee 5%Hospitality benchmarks (model assumption)
Fixed cost items€101.800 / YearAdmin OPEX items (owner input): utilities €24.000, maintenance €2.800 per key, insurance €8.000, accounting €10.000, admin €15.000
Corporate income tax22%Indonesian statutory rate; PT PMA structure and any final-tax regime to be confirmed
Depreciationbuildings 20 years, FF&E 8 yearsModel assumption for tax purposes
Development budget€3.210.000Admin budget table (owner input, 12 lines)
Working capital€190.000 = 3 months of operating costsModel formula
Pre-opening sales & marketing programme€75.000Proposal, pending approval
Exityear 5, cap rate 9.0%, selling costs 3.0%, transfer tax 2.5%Cap rate range stated by the owner (9–10%); selling costs and the 2.5% final transfer tax are model assumptions to be confirmed by counsel
Timelinedesign 4 m, permits 6 m, construction 18 m, pre-opening 2 m → Apr 2029Admin durations; start re-based to the funding deadline; 18-month construction as stated on the page
Financing100% equity, no debtNo financing terms on record
Points still to be validated

Points still to be validated

  1. Land title and legal structure: the budget line reads 'freehold', but foreign investors and PT PMA companies cannot hold Indonesian freehold (Hak Milik). The actual title (HGB, leasehold or nominee-free structure) must be confirmed by local counsel before any 'ownership' wording is used.
  2. Permits, zoning, environmental approvals and any development moratoria on Nusa Penida (brochure p. 3 flags them as a risk).
  3. Sea access and site constraints: 'direct sea access' is not documented; cliff-edge setbacks and access road status to be verified.
  4. Site area: the data sheet records 2,400 m², earlier copy said 5,000 m²; gross floor area of 3,636 m² to be reconciled with the plot and the allowed building coverage.
  5. Rate and occupancy comparables for boutique resorts on Nusa Penida; the brochure quotes island listings at ≈ USD 138 and a 55% base occupancy, both below the site's targets.
  6. Construction quotations: site works, infrastructure, pools, MEP and landscaping are not itemised (see budget).
  7. Staffing plan: no spa therapists, F&B manager, laundry or administration staff are listed; payroll may be understated.
  8. Tax and holding structure: corporate tax rate, PT PMA set-up, withholding on distributions and the tax on exit.
  9. Investor terms: the record stores conflicting terms (5% platform fee, 20% promote, 8% preferred return with a 70/30 split, 90/10 investor/sponsor equity). Returns shown are project-level, before any of these.
  10. Design brochure: page 4 of the downloadable brochure states a USD 138 baseline ADR and 55% base occupancy that predate this model; the brochure should be updated to match.
Restricted Access

Investor Documentation

Elite Network

Private Deal Room

Exclusively available to authorized investors.

Register to Access
Asset Discussion
Live
ANTONIO RUTILIO Final architectural refinements on the Master Villa are now complete.
PARTNER Excellent. Reviewing the updated ROI pro-forma now.
Geographic Connectivity

Logistics & Investor Journey

View on OpenStreetMap Global Access Analysis
Roadmap Legend
Option 1 (Main)
Road / Highway
Sea Way (Ferry)
Connectivity Guide 4 STEPS
Bali Airport Arrival
Road
15 min (Arrival)
Sanur Port Transfer
Sea
35 min (18.5 km)
Fast Boat to Nusa Penida
Road
45 min (22.3 km)
Final Resort Access
Road
12 min (5.4 km)
Total Travel ~ €45
Infrastructure Active
Lifestyle & Exploration

Local Attractions & POIs

Surroundings Analysis
Highlight Destinations
Diamond Beach
Diamond Beach
12 min (5.8 km) Open Maps

Unbelievable cliffside white sand beach on the eastern tip of Nusa Penida.

Kelingking Beach
Kelingking Beach
30 min (15.2 km) Open Maps

The famous T-Rex shaped cliff and pristine white sand beach below.

Broken Beach & Angel's Billabong
Broken Beach & Angel's Billabong
25 min (12.8 km) Open Maps

A scenic natural bridge arch over a turquoise sea cove.

Crystal Bay
Crystal Bay
18 min (9.4 km) Open Maps

Famous palm-fringed beach offering spectacular Balinese sunsets and snorkeling.

Penida Colada Beach Bar
Penida Colada Beach Bar
5 min drive Open Maps

Famous beachside bar known for live music, sunset views, and signature cocktails.

Cactus Beach Club
Cactus Beach Club
8 min drive Open Maps

Popular day club featuring a large pool, relaxed atmosphere, and international DJ sets.

Nomé Beach Club
Nomé Beach Club
15 min drive Open Maps

Premium beach club near Toyapakeh harbor with direct beach access and luxury daybeds.

Amok Sunset
Amok Sunset
25 min drive Open Maps

Iconic sunset destination offering panoramic ocean views and private bamboo nests.

Local Gems

Discover the best spots within minutes of your doorstep.

Geographic Connectivity

Logistics & Connectivity Hub

Coords: -8.679287, 115.5358
Proximity Benchmarks
Nearest Intl Airport 90 min (via fast boat to DPS)
Coastline / Beach Direct cliffside access
Nearest Harbor / Port 20 min from Sampalan Harbor
Road Infrastructure Paved road access
Medical Center Pratama Hospital (25 min)
Education Hubs Local primary schools (15 min)
Public Utilities & Services
RSUD Gema Santi (Hospital)
25 min drive

Main public hospital in Nusa Penida with 24/7 emergency services.

SMAN 1 Nusa Penida (School)
15 min drive

Primary educational hub for the local community.

Sampalan Traditional Market
12 min drive

Local fresh produce and daily necessities market.

PLN Nusa Penida (Power Grid)
10 min drive

Main regional power distribution center ensuring stable grid connection.

Buyuk Traditional Market
3 min drive

Authentic local market offering fresh regional produce, seafood, and daily essentials.

Nusa Penida Fast Boat Harbor
5 min drive

Main logistical hub for fast boat transfers to mainland Bali and neighboring islands.

Infrastructure Status
Connectivity 5G Network
Grid Reliability Stable (Public Grid)
Supply Chain Remote/Island Logistics
Strategic Overlay

Analyzing local development trends and infrastructure roadmap...